2 reactors, each of the units is 31 meter length, 7,1 meter wide, 7,2 meter high and weight 545 tonnes, were delivered from RO-RO berth of Izhorskiye Zavody, Saint-Petersburg to Samara berth at the Suhaya Samarka River in October/November 2013. Equipment was loaded into barge by RO-RO method and discharged by crane.
To implement the delivery, the project of lashing, securing and stowage, as well as the project of towage were developed.