In winter 2014 VBL together with Jumbo Shipping delivered from Margera port (Italy) to the port of Temryuk transshipped 10 adsorption columns for purification plant of Gazprom (CS “Kazachya”). To implement the complex transshipment under condition of low draft (4,5m), the stabilization pontoons were used.
Each column weight was 225 tons, length – 19m, diameter – 5m.